Two-Phase Utility Expansion & Cost Optimization Project

  • Project Scale

    17 MW PV Phase I + 20 MW PV Phase II
    Financial Performance: $1.3M/Year Cost Savings
    ROI < 3 Years

  • Project Mission

    To execute a phased 37 MW total utility expansion (17 MW Phase I + 20 MW Phase II) designed to optimize site energy economics, maximize total yield, and achieve rapid capital recovery—targeting over $1.3 million in annual energy cost reductions with a sub-3-year return on investment (ROI).

  • The Challenge Of Project

    Executing a large-scale, two-phase expansion while keeping Phase I fully operational and power-generating required continuous power output protection, tight site staging logistics, and adaptive racking and cabling management across diverse terrain conditions.

Project Information
Location
Nigeria
Capacity
37MW
Date:
2024