Two-Phase Utility Expansion & Cost Optimization Project
-
Project Scale
17 MW PV Phase I + 20 MW PV Phase II
Financial Performance: $1.3M/Year Cost Savings
ROI < 3 Years
-
Project Mission
To execute a phased 37 MW total utility expansion (17 MW Phase I + 20 MW Phase II) designed to optimize site energy economics, maximize total yield, and achieve rapid capital recovery—targeting over $1.3 million in annual energy cost reductions with a sub-3-year return on investment (ROI).
-
The Challenge Of Project
Executing a large-scale, two-phase expansion while keeping Phase I fully operational and power-generating required continuous power output protection, tight site staging logistics, and adaptive racking and cabling management across diverse terrain conditions.
Project Information
Location
Nigeria
Capacity
37MW