STAR TIMES PBG Phase I & II (Integrated Energy System)
-
Project Scale
10 MWp PV / 18 MWh BESS
Annual Power Generation: 1.31 GWh/Year
-
Project Mission
To establish a heavy-duty, utility-scale renewable energy framework by seamlessly integrating a 10 MWp solar PV array with an 18 MWh battery energy storage system (BESS). The primary goal is to stabilize energy flow, lower operational expenditure, and deliver clean, reliable baseline power to support industrial-scale operations in Nigeria.
-
The Challenge Of Project
Deploying a high-capacity 18 MWh BESS alongside a 10 MWp solar array required complex power conversion controls and grid-synchronization capabilities to prevent thermal throttling and system voltage instability during severe tropical peak loading hours.
Project Information
Location
Nigeria
Capacity
10 MWp PV / 18 MWh BESS
Date