EV Charging Infrastructure in Nigeria — Solar, Storage and Fast Charging on One Site

Integrated solar, storage and charging stations — designed, built and commissioned with the back-end management system included.

Why charging infrastructure needs solar and storage

A charging station is an electrical load first and a revenue asset second. Most sites underestimate the first part.

title-image

What we deliver

We build the station, not just supply the chargers.

Site assessment & demand planning

Grid capacity, traffic profile and charging demand assessed first.

Station design & civil works

Layout, foundations, canopy structures and site works.

Solar carport integration

Generation built into the structure above the vehicles.

Storage for load support

Voltage stabilisation, peak management and tariff control.

Electrical installation & commissioning

Full power installation, testing and handover.

Charging management & billing system

Back-end platform deployment as part of the project scope.

Three station formats

Chosen by site type, traffic and grid capacity.

Solar + Storage + Charging Hubs

On-site solar generation, battery storage and DC fast charging integrated to cut operating electricity costs. Suited to logistics parks, highway service areas and commercial complexes.

Public Fast-Charging Stations

High-power DC charging on urban roads, commercial districts and car parks, with multi-terminal intelligent billing and cloud-based back-end management.

Commercial Destination Charging

AC and DC charging bays for hotels, offices, shopping malls and industrial parks — raising the value of the property's amenities.

What the build includes

Solar carport integration

Generation and shade from the same structure.

Storage for voltage stabilisation

Protects charging performance when the grid dips.

Full electrical & civil construction

Foundations, structures, cabling and protection.

Back-end charging & billing system

Operator platform deployed and configured for you.

Designed around your grid capacity

Configuration matched to what the site can actually supply.

Commissioning & handover

Tested, documented and handed over ready to operate.

Who we work with

Logistics parks

Highway service areas

Commercial complexes

Hotels

Office buildings

Shopping malls

Industrial parks

Fleet operators

Open plain land

title-image

How we deliver your project

Every stage is delivered under a single EPC contract 

01
Consult

Site type, traffic profile and grid capacity.

02
Design

Station layout, capacity and configuration.

03
Build

Civil and electrical construction, commissioning.

04
Maintain

System management and O&M after handover.

title-image
FAQ

Frequently asked questions

In many cases storage makes this possible by buffering the load. We assess site capacity before proposing a configuration.

Yes. Back-end charging and billing system deployment is included in our scope.

Solar is typically combined with grid and storage. A fully off-grid charging station depends on traffic volume and site conditions.

We provide O&M support; commercial operating arrangements are agreed per project.